THE EMPENNAGE

 

The empennage arrived in 2 boxes on 5-1-02.  On Saturday, 5-4-02, I opened the boxes for inventory.

 

2 Boxes of Empennage Parts, 3 boxes of tools Inventory on the living room floor

 

Photo on the left is of the 2 boxes containing the empennage.  The smaller of the 2 boxes arrived 2 days after the larger one due to an error in the address.  The other three boxes are tools from Cleaveland Tools (see tools).  Right photo is of the inventory in progress.  Nothing was missing.  When the inventory was complete, I started the assembly.  The first assembly to get started was the Horizontal Stabilizer, followed in order by the vertical stabilizer, the rudder, the left elevator, the elevator trim tab and last but not least the right elevator.

 

THE HORIZONTAL STABILIZER

 

THE VERTICAL STABILIZER

 

THE RUDDER

 

THE LEFT ELEVATOR

 

THE ELEVATOR TRIM TAB

 

THE RIGHT ELEVATOR

 

THE EMPENNAGE FIBERGLASS

 

HOME